Apartment Renovation in Sydney

Apartment renovation in Sydney starts with approval from your owners corporation, and anything that touches waterproofing, walls or services also needs a licensed builder.

Freestanding bath on a patterned tile floor beside a window
Freestanding bath on a patterned tile floor beside a window

That is the difference between renovating an apartment and renovating a house. You share the structure, the pipes and the waterproofing with your neighbours, and a mistake in your unit can show up in theirs. We renovate apartments for owners across Sydney, and we work in Class 2 buildings every day, so the approvals and the compliance side are part of the job from the first visit.

Approval from your owners corporation comes first

Before any work starts, check what the building’s by-laws and the Strata Schemes Management Act 2015 require for the work you have in mind. Strata law in NSW sorts renovations into cosmetic, minor and major work, and each has its own approval route. Cosmetic work is the lightest. Anything that changes walls, floors, plumbing or common property sits higher, and some of it needs a vote at a general meeting. NSW Fair Trading publishes the renovation rules for strata owners, and your strata manager can tell you which category your plans fall into.


Get the approval in writing before you commit to a builder or a start date. We can work from your approved scope, and we can help you describe the work clearly enough for the committee to decide.

Wet areas and waterproofing

Bathrooms, laundries and kitchens are where apartment renovations go wrong, because water that gets past a failed membrane lands in the unit below. Waterproofing is licensed work, and in a Class 2 building it sits inside the regime that the Design and Building Practitioners Act brought in. Our guide to the DBP Act explains why that matters for the owners corporation as well as for you.


We are licensed builders working in Class 2 buildings as our main work. For you, that means the waterproofing is part of the renovation scope rather than a trade booked in separately and hoped for.

Finished bathroom with a glass shower screen, marble mosaic wall tiles and a vessel basin

What we renovate

We renovate every room and area of an apartment: kitchens, bathrooms, laundries and whole-apartment renovations where walls, floors, joinery and finishes change together. We also renovate multiple dwellings in the same building and common areas. Tell us what you want to change and we will tell you what it will involve in your building, including what the owners corporation will need to see first.

Working in a building with neighbours

Your neighbours live next to the work, above it and below it. On occupied buildings we use dust control, clear signage and scheduled noise hours, and we keep a direct line to the strata manager so the building knows what is happening. The approach is set out in our post on occupied buildings.

How a job runs

1

Inspection

An inspection of the apartment and a conversation about what you want.

2

Written scope and quote

A written scope and quote.

3

Owners corporation approval

The approvals from the owners corporation, which you hold and we support.

4

The work

The work, with the waterproofing and plumbing done before the finishes.

5

Handover

Handover, with the paperwork the building and your records need.

For bigger changes, such as moving walls or services, we can plan the work from start to finish with our preferred architects, engineers and certifiers, so you deal with one builder rather than several consultants. If you have already engaged your own architect, engineer or certifier, we work with them instead. We can also provide a scope of work for the owners corporation.


The cost depends on the scope and the building, so we quote after the inspection rather than from a rate card.

Book an apartment renovation inspection

Send us the address, the rooms you want to renovate and any approval you already hold. We will inspect and come back with a written scope. Our work is carried out under NSW builder licence No. 283692C, held by Sydney Building & Construction Group Pty Ltd. Request a site inspection.